New 98,825 SF, ground-up, two-story, concrete tilt-up warehouse addition with high-bay storage, canopies, and loading docks, and a 7,000 SF two-story office building, as well as 400,000 SF of new fleet truck parking area.  The warehouse building was built on an existing, operational campus, therefore, construction was phased to maintain product distribution throughout construction.  The project incorporated several “green” components including 170 skylights combined with a lighting controls package designed to minimize energy consumption.

“Everyone at DesCor has been wonderful to work with. Great job, great team and great results. Thanks for all your help and understanding through this ordeal. Thanks again and here’s to the next time!”

– Don Quinn, Director of Operations | Sacramento Coca-Cola Bottling Co., Inc.