Construction of 3 new tilt-up warehouse cold shell buildings totaling 314,617sf. Scope included grading, underground utilities, a reinforced concrete slab on grade, concrete panel wall erection, structural steel truss system, panelized roofing system and TPO membrane roof top. Building F: 81,663sf, Building G: 153,011sf and Building H 79,943sf.