Site Preparation: Palladio Building 150

PHI: Demolish North façade and portion of Bldg. 150 to increase the area of the existing building from 15,396 GBA to 33,396 GBA.  Building 150 (future Nordstrom Rack) to be a structural steel frame system with open web joists, skinned in metal studs and stucco with Glass Fiber Reinforced Cement (GFRC) decorative elements and a tile base.  Building 150 includes a new loading dock ramp with overhead roll up doors, dock leveler and bumper equipment as well as a new trash compactor and bin.

Featured Articles: Future Nordstrom’s Rack in Folsom

Nordstrom Rack

PH II: 32,924 SF interior improvements for Nordstrom’s Rack to include: new finishes, non-structural partitions, new casework for retail sales floor, personnel offices, stock storage and associated MEP systems.